The joist hanger provides a strong connection between a 2x6 floor, ceiling or deck joist and the header. Joist hangers install easily, eliminate the need for toe-nailing and are required by the building code in many areas.
Our metal building always include our exclusive pre-engineered tubular steel frame system. Designed to strict engineering standards and manufactured from top-grade, multi-coated domestic steel, our building frames are second to none.
The beauty of the lgs framing structure is that it allows every building to be custom-engineered and put the strength of the steel in the places where it is needed most, while reducing it where it is not needed as much. This creates a very efficient system that saves on weight, cost, and time.
We provide all construction decoration materials, complete installation drawings, installation guide service and send engineers to ensure turnkey projects.
Z-section steel is usually used in large steel structure plants as an important building material. The processing length and hole can be made according to the processing requirements.
C-section steel is widely used in purlins and wall beams of steel structure buildings, and can also be combined into lightweight roof truss, bracket and other building components.