The battery energy storage system (BESS) containers are based on a modular design. The energy storage power station can be expanded by connecting multiple container systems in parallel to meet the capacity demand of the project.
EverExceed 144 cells half cut solar modules are assembled with multi-busbar PERC cells, the half-cell configuration of the modules offers the advantages of higher power output, better temperature-dependent performance, reduced shading effect on the energy generation, lower risk of hot spot, as well as enhanced tolerance for mechanical loading.
Compared with ordinary bearing units, stainless steel bearing units not only have obvious advantages in terms of material, but also have stricter technical and precision control than ordinary bearings.
1.Assembled with multi-busbar PERC cells,the half-cell configuration of the modules offers the advantages of higher power output,reduces BOS cost effectively;
2.Special half-cell design reduces the energy loss caused by shadows,better anti-shading performance;
3.Lower hot spot risks due to half-cell layout,offers an additional level of safety;
4.1500V DC voltage of the system,reducing the cost of the system side;
5.The overflow tank is waterproof with double layers,and the cross section contains hooked aluminum frame,which enhances the mechanical load strength by 10%;
6.Passed the certification test of 5400 Pa snow load and 2400 Pa wind load;
Using CNC machining processing method,guarantees the tolerance,flatness,no burrs and dirt during processing.Various surface treatment effects can be made according to customer requirements.All products 100% inspected by QC and will make confirmation with customer before shipment.
Industrial Hybrid Off Grid Solar Energy System 10KW 20KW 30KW 50KW 80KW 100KW, it can be connected to generators and the national grid, suitable for any commercial site, fully self-contained system, with battery backup energy.